Project Manager (State Govt.)

Unedollar Ok-sign    posted about 5 years ago

Contract | Staffing Agency | | 12 Months Austin, TX


Description:

Project Manager – 539410282013A_DADS

Task 1.                        Work Prioritization:

{C}·         Work with DADS IT EHLR PM, SSLC Facilities Director and IT IO Director to prioritize each building within a site based on the number of aggregation points from each building.

{C}·         Prioritize each SSLC based on the current risk level.

{C}·         Work with the DADS IT EHLR PM, SSLC Facilities Director and IT IO Director to identify the business areas in need of stabilization and improvements based on the level of performance needs.

{C}·         Work with the DADS IT EHLR PM, SSLC Facilities Director and IT IO Director to gather required information to include but not limited to:

{C}·         Building construction

{C}·         Detailed building diagrams containing

{C}·         Size

{C}·         Construction material

{C}·         Room placement

{C}·         Existing cabling

{C}·         Facility layout including but not limited to:

{C}·         Building distance

{C}·         Soil composition

{C}·         Existing fiber location

{C}·         Trenching constraints

{C}·         Work with the DADS IT EHLR PM, DADS Security PM, DADS Information Security Officer, SSLC Facilities Director and IT IO Director to install Intrusion Prevention System hardware/software to monitor network and/or system activities for security purposes.

{C}·         Develop 3 site packages containing four SSLCs per package.  Each package could be aligned but not limited to:

{C}·         Geographical location

{C}·         Number of high, medium, and low priority sites.

 

Task 2.                        Detailed Assessment:

{C}·         Identify a representative sample of SSLC sites for the following steps.

{C}·         Procurement by DADS IT of services by a network cabling company to perform a detailed:

{C}·         Fiber plant assessment at each of the representative sampling of the SSLC sites.

{C}·         Wireless heat map for Signal penetration at each of the representative sampling of the SSLC sites

 

Task 3.                        Design and Implementation SOW:

{C}·         Develop a written approach, subject to DADS IT approval, for the design and implementation of the network refresh.

{C}·         The written approach should require:

{C}·         Participation of a vendor walk-through of the representative sites

{C}·         Each approach should include:

{C}·         A detailed bill of material,

{C}·         fixed price cost for each of the sites within a package.

 

The PM will oversee all tasks and report status to the DADS IT EHLR PM.  Further information on detailed project tasks will be discussed with the DADS IT EHLR PM once onboarded.

 

 

 

 

 

 

II.                WORKER SKILLS AND QUALIFICATIONS

 

            Minimum Requirements:

Years

Skills/Experience

8

Extensive work experience and understanding of project management life cycle (PMLC) and system development life cycle (SDLC) methodologies.

8

Experience in identifying potential project risks and issues and documenting strategies to accept, mitigate, or avoid.

8

Experience in conducting meetings and/or presentation preparation tasks as needed (e.g., prepare or oversee preparation of and provide agendas and pre-meeting materials as well as follow-up notes, post meeting materials, assignment follow-up and related activities).

8

Experience in MS Office Suite.

Strong

Must have strong writing, analytical, interpersonal, organizational, and communications skills with project management experience.

        

            Preferences:

Years

Skills/Experience

5

Experience working in a state/federal government environment

5

Project Management Professional (PMP) certification.

Employer avg response time
  • Relocation Assistance: No
Need more information? Submit your question to employer